Schofield Ave (Normandy St to Birch St):
- Week of 9/29: Continue working on street grading, traffic signals and concrete work along the eastbound lanes.
- Week of 10/6: Continue with concrete work, road grading if needed, traffic signals and potentially first layer of asphalt paving.
Weston Ave (CR-X to Ryan St):
- Week of 9/29: Rock drilling and blasting to continue as needed between Lindenwood Ct and Ryan St. Sanitary sewer installation to continue as rock is cleared and watermain to follow behind sanitary installation. Grading to continue where utility work is completed.
- Week of 10/6: Sewer and water installation will continue with road building following utility installation.
Fuller St:
- Week of 9/29: North of Thomas Ave look at grading and potentially first layer of asphalt. Then between Schofield Ave and Meridian, grading of the multi-use path. From Meridian north watermain and storm sewer installation will continue along with building of the road. Pond excavation work will be ongoing at Kellyland Park as well.
- Week of 10/6: Asphalt is planned to be paved from Thomas Ave north to Ross Ave. Road building between Meridian and Rogan. Storm sewer work on Rogan Ln possibly starts this week as well.
Business Park Paving (Commerce Dr and Ryan St):
- Week of 9/29: Complete all paving work.
- Week of 10/6: Pavement markings potentially being applied on Ryan St.
Hospital Area Paving:
- Week of 9/29: Cranberry Blvd is planned to be closed for road pulverization and concrete curb repairs.
- Week of 10/6: Continue working on Cranberry Blvd and potentially move onto an adjacent street with concrete repairs.
Asphalt Overlay Projects:
- Paving of the below areas are planned to be worked on 10/1 to 10/3.
- Post Ave (West of BUS 51)
- Cortez, Coronado and Lawndale (North of Jelinek)
- Terrier and Birchwood Ln (South of Jelinek)
- Alex St (West of Sandy Ln)
- Michael Dr
- Cheryl Dr
- Jacob St
- Twin Pines Ln
- Morning View (East of Twin Pines)
- Babl Ln (East of Twin Pines)
- Saxon Ave
- Regent St
- Meridian St
Shorey Ave Repaving (County Road X to Anastasia Dr):
- Paving of driveways is anticipated to be completed on Saturday, 9/27.